ELEVATED MRT

HOME / PROJECTS / LED LIGHTING

ELEVATED MRT

The Klang Valley MRT project is the construction of a rail-based public transport network for the greater Klang Valley. The first MRT line to be implemented is the 51km Sungai Buloh-Kajang line. The line will run underground for a distance of 9.5km beneath the centre of Kuala Lumpur while the rest of the alignment is elevated. The line will have 31 stations of which 24 will be elevated.

Part of the tender requirements was that the lights are to be manufactured by or partnered with shortlisted Malaysian manufacturers. AdvanLED is one of these companies recognised by MRT to be capable to supply the products for this project.

One of the challenges was to consolidate the ID design intent with the stringent safety requirements for a public transportation facilities.

Therefore, constant modifications and coordination were required between AdvanLED & the architects. Finally, the products were delivered and hand over to site in the end of December 2015.

 

 

Sungai Buloh

Kampung Selamat

Kwasa Damansara

Kwasa Sentral

Kota Damansara

Surian

Mutiara Damansara

Bandar Utama

Taman Tun Dr Ismail

Phileo Damansara

Pusat Bandar Damansara

Semantan

Taman Pertama

Taman Midah

Taman Mutiara

Taman Connaught

Taman Suntex

Sri Raya

Bandar Tun Hussien Onn

Batu Sebelas Cheras

Bukit Dukung

Sungai Jernih

Stadium Kajang

Kajang

Contact Us Today - Speak With A Consultant

Contact Us